Wednesday, 12 October 2011

Working, working, working

So as luck would have it, I appear to be coming down with something, definitely the worst time to get sick, but I've got until Friday to tough it out.

Since Monday it has been go go go in terms of getting things done, working on my model and finishing it up so I can do a proper A1 animation of the final design. In the A1 drawings I planned to show all the things not already visible in the model, that is, the light atrium, stair wells, other part of the building, accessway, relation to site and bridge to the tram track.

It took a lot longer to get the animation done than I thought, I chose not to go to design because of the long commute/more time I could have spent on the animation at home, which really paid off. In terms of accuracy I first lightly sketched the drawing (I chose to do an axonometric to show the most of the building and surrounding area) then went over it properly for animation purposes. It took two whole days but I finally have a product that I am very happy with, and have uploaded it to Youtube. I'm not too sure how I'm going to present the video to the crits on Monday, but I'll be bringing my laptop with me, just in case.

Here is the Youtube link:

http://www.youtube.com/watch?v=Fgqxkr1fxT0

No comments:

Post a Comment